
01Financing
Credit ain't perfect?
Join the club.
Most of our folks go with a chattel loan — it's on the home only, it's the least hassle and it closes quickest. Want the land rolled in? A land & home loan can do it, it just takes more paperwork and more waitin'. Here's how they stack up, no banker talk.
02The six paths
Ways to pay for it, plainly.
Rates move every week, so we don't print them here — call us and we'll tell you what folks are closing at right now. Your number depends on credit, down payment, term and whether the land's in the deal.
Chattel (home-only)
Low downThe loan's on the home, not the dirt. Least paperwork, quickest close, and it's how most of our folks buy. Works whether you own the land, it's family land, or you're renting a lot. The rate runs a little higher than a mortgage, and we'll show you the real numbers side by side.
Your land, family land, or a rented lot
Land & home
VariesHome and land financed together as real estate. It can mean a lower rate and a longer term, but fair warning — it's more paperwork, more inspections and appraisals, and it takes a good while longer to close. We'll tell you straight whether it's worth the wait for you.
Land in the deal · permanent foundation · appraisal
Conventional
5% downFannie Mae's MH Advantage and Freddie's CHOICEHome can price manufactured homes near site-built rates when the home meets their criteria. Part of the land & home road — same paperwork, same wait.
Owned land · permanent foundation · real-property title
FHA Title II
3.5% downThe most forgiving credit profile of any real-property option, and the lowest down payment. Requires an engineer's foundation certification.
Owned land · permanent foundation · 400+ sq ft
VA
0% downNo down payment and no mortgage insurance. Fewer lenders write VA on manufactured homes, so the shortlist is short — ask us who's writing them.
Eligible service · owned land · permanent foundation
USDA Rural
0% downUSDA eligibility is drawn by tract rather than by town, and the map surprises people. Worth ten minutes with it before you assume you don't qualify — note that it applies to land you own, not a leased pad.
Eligible rural parcel · new home only · income limits
Cash
Paid in fullThe simplest road there is: no lender, no appraisal, no credit check and no monthly payment. Pick your home, we write up the deal, and it goes on order without waiting on anybody's underwriting.
Funds in hand
03Run it yourself
Move the sliders. Watch the gap.
Put in the price you are working with, then switch between the two loan types with everything else held constant. That difference is the whole argument for buying the land.
What it actually costs a month
EstimateYou own the ground and the home sits on a permanent foundation, so it titles as real property. Conventional, FHA, VA and USDA all lend here.
Estimated monthly
$1,498/ mo
- Principal & interest
- $1,242
- Property tax
- $161
- Insurance
- $95
- Home + land
- $215,000
- Amount financed
- $193,500
- Interest over the term
- $253,693
- Total of payments
- $468,693
Illustrative only. Rates move, and your actual terms depend on credit, the community, and whether the home titles as real or personal property. We will put a real lender quote in front of you before you sign anything.
04Order of operations
Do these in this order and nothing goes wrong.
Almost every purchase that falls apart falls apart because somebody did step four before step one.
- 01
Know where it's going
Your land, family land, or a rented lot — that tells us which loan fits. Most folks go chattel and are done quick. If you want the land wrapped into a land & home loan, we'll start that paperwork early, because it takes longer.
- 02
Pre-approval, not pre-qualification
A pre-qualification is a lender being polite. A pre-approval is underwriting having actually looked. Ask for the second one; it costs nothing and takes about four days.
- 03
Site check and cost-to-set
Access, utilities, setbacks, soil, permits. This is the line item that surprises people, so get it in writing before you order.
- 04
Order and lock
Sign the purchase agreement and we place the order with the factory. Pick your colors and upgrades before it goes on the line.
- 05
Close at set, not at order
You do not start paying a mortgage on a home that is still a stack of lumber. Funding happens when the home is on its piers and the foundation certification is signed.
05Money questions
Asked and answered.
Real-property lending generally starts around 620, and FHA will go lower with compensating factors. Chattel lenders write down to about 575 at a price. If you are below 620 and can wait six months, the difference between fixing your score and not fixing it is usually larger than the difference between any two homes on this site.
Yes, and people do. It requires acquiring the land (or the community converting to resident ownership), installing a permanent foundation, and retiring the personal property title through your state's conversion process. It is paperwork, an engineer's certification and a refinance — not a rebuild.
Download our credit application (it's a PDF), fill it out, and bring it by the lot or email it in — or just call (352) 378-2453and we'll walk you through it over the phone. Get the credit application.
Want a real number instead of an estimate?
Tell us the parcel or the community and we will put a lender quote and a written cost-to-set in front of you.
